[1]
“10 kW Grid-Connected PV System Cost and Environmental Analysis for Government Offices: Darbandikhan Technical Institute as a Case Study: Darbandikhan Technical Institute as a case study”, UKHJSE, vol. 4, no. 2, pp. 157–165, Dec. 2020, doi: 10.25079/ukhjse.v4n2y2020.pp157-165.